Badgers At Former Landfill Site Protected During Construction of Waste-Handling Plant

As construction workers build a new waste-handling plant at a former landfill, they are careful to not harm the badger population that calls the area home.

November 10, 2022

1 Min Read
badger_1540x800.png
incamerastock / Alamy Stock Photo

The former Longman landfill site is now home to families of badgers. With the construction of a new waste-handling plant, the badgers have been disrupted, however, not without some protective measures pushback. The animal is a protected species and therefore has been allotted regular monitoring by an ecologist and a 32-foot exclusion zone. Due to both these measures and a rise in the cost of building materials, the cost of the project has risen to £14m.

Read more here.

Stay in the Know - Subscribe to Our Newsletters
Join a network of more than 90,000 waste and recycling industry professionals. Get the latest news and insights straight to your inbox. Free.

You May Also Like